VT Logo1.gif (4747 bytes)

Vernon Township
William Peterson, Township Supervisor

Even in the cold weather, construction crews continued to work on various components of the project.
3701a.jpg (39904 bytes)

Workers from Paragon-Aquatech spray concrete onto the remaining wall.  This concrete was sprayed into place to create a curved junction between the pool wall and floor.

3701c.jpg (38095 bytes)

Other workers began connecting the pipes for the filtration system.

3701b.jpg (40313 bytes)

These workers are finishing the brick work on the pool filter building.

Return to Picture Index Page