Construction was put on hold during the snow storms and cold weather in
December.  In January, construction teams began preparing for the construction
of a small building that will hold the pool pumps and chemical systems.
12201a.jpg (54293 bytes)

This pit is for the foundation of the pump room.

 

12501a.jpg (45588 bytes)

The foundation walls have been set and the skeleton of the pump building is beginning to take shape. This building will house the new filtration system, new computer controlled chemical system and the pump for the water slide.

12901a.jpg (44197 bytes)

The walls of this building will be covered with brick, matching the registration pavilion constructed last year.